Friday, November 20, 2009

China Module Progress

Here's a shot of one of 2 transition modules that allow the main line on the China module (12" from back drop) to connect to other modules that meet the HOn30 module standard of a main line 6-7/8" from the back drop. The Heki grass mat is coming off and needs to be reglued. The good 3M spray adhesive will be used this time.







Here's the scratch-built China station model that will go on the module. Campbell shingles, Grandt windows and Evergreen styrene clapboard siding was used. Next up to add the Steven's Creek cast metal chimney, paint the roof and build the platform.










The China module at left still has grey Celluclay on the road and next to the team track. Next steps are to paint and texture the road and unloading area next to the team track.

No comments: